Installations of power plants and combined heat and power plants

We provide comprehensive ventilation control solutions for such facilities as power plants and combined heat and power plants, confirmed with appropriate references.

One of the main implementations was the implementation of a complete ventilation system for the BC50 heating unit with a coal-fired boiler and a steam turbine set with installed capacity of 65 MWe / 86 MWt for Zakład Wytwarzania Tychy.

As part of the works, ventilation was launched in the control room, sorbent tank, bottom and fly ash tanks, engine room, and boiler room. Additionally, a staircase smoke extraction system in communication pylons was installed.